The Westgate Bridge Strengthening Project was one of Melbourne’s largest infrastructure projects, operated by John Holland. Scaffold Logistics were engaged to provide access and support solutions as well as scaffolding project management to facilitate the challenging operations required to achieve the project’s objectives.
The bridge scaffolding scope of works included providing all design and engineering requirements, scaffold equipment which exceeded 3000 tonnes, and personnel resources to carry out onsite scaffold operations – all of which Scaffold Logistics provided through our stringent quality management systems.
Scaffold Logistics successfully carried out all bridge scaffolding operations, exceeding the project’s tight program schedule with a completely incident-free safety performance, achieving our client’s target of a Zero Harm Environment.
Scaffold Logistic’s performance and scaffolding project management on the Westgate Strengthening Project provided our client with the confidence to allocate Scaffold Logistics to a preferred supplier status.
Scaffold Logistics have continued to provide our client with innovative solutions through a number of subsequent projects.
Client: John Holland
Location: Melbourne, Australia
2 Summit Road,
Noble Park North VIC 3174
35 Sammut Street,
Smithfield NSW 2164