Delta Group’s Wanda project drew on all of Scaffold Logistics past expertise to successfully meet all critical project programs.
Located right on Circular Quay meant that Safety was of paramount importance as the project interfaces with major arterial railway & motorway services.
Requiring scaffold to a 130m high facades demanded Design & Engineering expertise of a very high standard.
To fast track the project Scaffold Logistics designed a structural steel support system that allowed scaffold erection to begin at approximately the 90m level so that works could commence much sooner on upper levels as the lower level scaffold was being erected.
2 Summit Road,
Noble Park North VIC 3174
35 Sammut Street,
Smithfield NSW 2164